双盾敞开式TBM适应性与工程应用对比分析
网络出版日期: 2023-07-14
Comparative Analysis on Adaptability and Applications of DoubleShield Open Tunnel Boring Machines
Online published: 2023-07-14
杜立杰 , 张正 , 李青蔚 , 张卫东 , 杜传奇 , 刘家驿 , 杨亚磊 . 双盾敞开式TBM适应性与工程应用对比分析[J]. 隧道建设, 2023 , 43(6) : 921 -928 . DOI: 10.3973/j.issn.2096-4498.2023.06.002
To investigate the advantages and disadvantages of the new doubleshield open tunnel boring machines(TBMs) and compare them with the conventional mainbeam open TBMs, a case study is conducted on Beijiang water diversion project and Nabang hydropower station project bored by the two open TBMs. First, theoretical comparative analysis is conducted from the aspects of the main machine structure, rock support equipment layout, and construction advantages and disadvantages. Second, engineering application comparison is performed from the aspects of utilization rate of excavation time, construction speed, and geological adaptability. The results show the following: (1) Construction speed of both the TBMs is almost the same when tunneling in complete or relatively complete Grades Ⅱ and Ⅲ surrounding rocks. (2) For surrounding rocks of Grades Ⅳ and Ⅴ or fault fracture zones, the construction speed and adaptability of the doubleshield TBMs are comparatively poor. Therefore, the doubleshield open TBMs are recommended to be employed in smalldiameter tunnels with complete or relatively complete surrounding rocks or less fault fracture zones and tunnels with small curvature radius.
/
| 〈 |
|
〉 |