针对成昆铁路峨攀段K279发生的崩塌落石灾害,首先,采用Rockfall软件进行落石轨迹及冲击动能分析,评定落石对铁路的危害程度。然后,根据冲击动能计算结果确定坡面帘式防护网的设置范围及被动网和其他防护措施的设置,根据落石影响范围确定明洞接长范围。对于接长明洞,结合现场地形,提出在铁路运营期间增设明洞时采用明洞内外边墙现浇、明洞拱圈预制拼装的方案。最后,介绍明洞内外边墙现浇、明洞拱圈预制拼装方案的设计及施工情况。根据最终的整治效果可知,采用预制拼装式明洞结构方案可安全快速地在既有线增设明洞结构。
In view of the collapse and rockfall disaster occurred
in the K279 section of the EmeiPanzhihua section of the ChengduKunming railway, the Rockfall software is employed to analyze the
rockfall trajectory and impact kinetic energy and assess the damage degree of
rockfall to the railway. Furthermore, based on the calculation results of
impact kinetic energy, the setting range of the slope curtain protection net
and the setting of the passive net and other protective measures are
determined, and the extension range of the opencut
tunnel is determined based on the impact range of falling rocks. For the
extension of the opencut tunnel, an innovative
proposal that use the castinplace
inner and outer walls of the opencut tunnel and the
prefabricated assembly of the opencut tunnel arch ring
when adding an opencut tunnel during railway operation
is proposed based on the onsite terrain. Finally, the
design and construction of the castinplace inner and outer walls of the opencut
tunnel and the prefabricated assembly plan of the opencut
tunnel arch ring are introduced. According to the final rectification effect,
the use of prefabricated and assembled opencut tunnel
structures can safely and quickly add opencut tunnel
structures to existing lines.