深圳滨海大道改造工程超宽坑中坑降水与开挖响应实例分析

  • 韩辉 ,
  • 王锐松 ,
  • 倪芃芃
展开
  • (1. 中铁四局集团有限公司, 安徽 合肥 230041; 2. 中山大学土木工程学院, 广东 珠海 519082)
韩辉(1983—),男,陕西咸阳人,2016年毕业于华东交通大学,土木工程专业,本科,高级工程师,现从事道路、桥梁及基坑工程研究工作。Email: 2436167856@qq.com。*通信作者: 王锐松, Email: wangrs3@mail2.sysu.edu.cn。

网络出版日期: 2024-01-04

Dewatering and Excavation Response of an UltraWide PitinPit in Binhai Avenue Renovation Project in Shenzhen, China

  • HAN Hui ,
  • WANG Ruisong ,
  • NI Pengpeng
Expand
  • (1. China Railway No.4 Engineering Group Co., Ltd., Hefei 230041, Anhui, China; 2. School of Civil Engineering, SunYat sen University, Zhuhai 519082, Guangdong, China)

Online published: 2024-01-04

摘要

为探究超宽坑中坑降水与开挖过程中基坑变形和地下水的变化特征,采用实测分析方法对围护结构侧移、地表沉降、周边建筑物沉降及地下水与潮汐水之间的关系进行分析。同时,利用ABAQUS有限元软件建立考虑潮汐补水的三维流固耦合模型,研究基坑降水和开挖过程中地下连续墙的侧移规律,并验证分段降水控制和换撑措施对墙体变形的控制效果。主要结论如下: 1)基坑开挖过程中,围护结构最大侧移为29.5 mm,南北墙顶均向坑外侧移,地表沉降最大为29.4 mm,立柱、周边建筑物竖向位移量均小于6.5 mm; 2)潮汐补水和降雨导致南北两侧坑外水位降落分别约-1.0 m和-1.5 m; 3)在坑中坑降水和开挖深坑阶段,采用分段降水控制和钢支撑换撑使墙体最大侧移减小约29%和21%。

本文引用格式

韩辉 , 王锐松 , 倪芃芃 . 深圳滨海大道改造工程超宽坑中坑降水与开挖响应实例分析[J]. 隧道建设, 2023 , 43(12) : 2026 -2035 . DOI: 10.3973/j.issn.2096-4498.2023.12.005

Abstract

Herein, to investigate the characteristics of dewatering, excavationinduced deformation, and groundwater variation in an ultrawide pitinpit in the Binhai avenue renovation project in Shenzhen, China, deflection of retaining structures, settlement of surfaces and surrounding structures, and correlation between groundwater and tidal water are analyzed using a field monitoring method. Moreover, a threedimensional fluidsolid coupling model is established considering tidal water replenishment using the ABAQUS finite element software to explore the development characteristics of underground diaphragm wall deflections during dewatering and excavation processes. The model validates the control effect of the staged dewatering control method and steel bracing change scheme on wall deformation. The following conclusions are drawn: (1) During the excavation process, the maximum wall deflection is 29.5 mm and the north and south wall tops move outward. Further, the maximum surface settlement is 29.4 mm, and the vertical displacements of columns and surrounding structures are <6.5 mm. (2) Tidal water replenishment and rainfall lead to a water level drop of approximately 〖WTBZ〗-〖WT5《TNR》〗1.0 m in the north and 〖WTBZ〗-〖WT5《TNR》〗1.5 m in the south outside of the pit. (3) During the dewatering and excavation phases, the staged dewatering control method and steel bracing change scheme reduce the maximum wall deflection by ~29% and 21%, respectively.