- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
(1. 山东大学齐鲁交通学院, 山东 济南 250002; 2. 山东高速集团有限公司, 山东 济南 250098;3. 山东高速基础设施建设有限公司, 山东 济南 250014)
网络出版日期: 2024-06-22
Mechanical Properties of SprayApplied Waterproofing Lining Under Seepage Fields Effect
(1. School of Qilu Transportation, Shandong University, Jinan 250002, Shandong, China;2. Shandong Hi-Speed Group, Jinan 250098, Shandong, China;3. Shandong Hi-Speed Infrastructure Construction Co., Ltd., Jinan 250014, Shandong, China)
Online published: 2024-06-22
李洛宁 , 王海宁 , 李树忱 , 胡超 , 韩勇 , 满新杰 . 喷膜防水衬砌在渗流场作用下的力学性能研究[J]. 隧道建设, 2024 , 44(5) : 1045 -1055 . DOI: 10.3973/j.issn.2096-4498.2024.05.012
The law of bonding and deformation of sprayapplied wagterproofing lining under seepage field is unclear, which affects the application and popularization of sprayapplied waterproofing lining structure. To address this problem, a highspeed cross tunnel is taken as the research object. First, the varied forms of waterproof layers for different waterproof lining structures are simulated using the builtin interface elements of FLAC3D finite difference software based on tested interface normal and circumferential parameters. Then, the surrounding rock seepage field and lining permeability performance are given attributes through the builtin seepage modes, and the mechanical properties and interface characteristics of different lining structures are compared and analyzed. Finally, the mechanical properties of sprayapplied waterproofing lining are obtained under different seepage fields. The results indicate the following. (1) The waterproof layer has a considerable impact on lining stress. Adopting an appropriate waterproof membrane structure can improve the collaborative stress capacity of the lining concrete; however, it causes an accumulation of water pressure behind the lining. This effect is more significant under longterm rock loading and high water pressure. (2) Under high waterpressure conditions, the structural stresses of the sprayapplied waterproofing lining differ from those of the traditional composite lining; in particular, the changes in internal force and safety factors should be examined. (3) The economy of the lining should be improved under the condition of the safety of tunnel operation. For the construction sections in which high water pressure is likely, adopting measures such as drainage design and lining structure optimization is recommended.
/
| 〈 |
|
〉 |