- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
Calculation Method of Long-Term Settlement and Optimal Tunnel Depth of Shield Tunnel in Under-Consolidated Soft Soil Under Static and Dynamic Load(静-动荷载作用下欠固结软土盾构隧道长期沉降与最优埋深计算方法)
(1. 重庆大学土木工程学院, 重庆 400045; 2. 山地城镇建设与新技术教育部重点实验室, 重庆 400045;3. 库区环境地质灾害国家地方联合研究中心, 重庆 400045; 4. 广州地铁集团有限公司, 广东 广州 510220)
网络出版日期: 2024-10-12
Calculation Method of Long-Term Settlement and Optimal Tunnel Depth of Shield Tunnel in Under-Consolidated Soft Soil Under Static and Dynamic Load
(1. School of Civil Engineering, Chongqing University, Chongqing 400045, China; 2. Key Laboratory of New Technology for Construction of Cities in Mountain Area, Chongqing University, Chongqing 400045, China; 3. National Joint Engineering Research Center of Geohazards Prevention in the Reservoir Areas, Chongqing University, Chongqing 400045, China; 4. Guangzhou Metro Group Co., Ltd., Guangzhou 510220, Guangdong, China)
Online published: 2024-10-12
仉文岗
,
唐学成
,
刘汉龙
,
杨文钰
,
刘智成
,
王鲁琦
,
李红蕊
.
Calculation Method of Long-Term Settlement and Optimal Tunnel Depth of Shield Tunnel in Under-Consolidated
Soft Soil Under Static and Dynamic Load(静-动荷载作用下欠固结软土盾构隧道长期沉降与最优埋深计算方法)
/
| 〈 |
|
〉 |