Statistics of China′s Railway Tunnels by the End of 2024 and Overview of Tunnels of New Projects in 2024(截至2024年底中国铁路隧道情况统计及2024年新开通项目隧道情况介绍)

  • 巩江峰 ,
  • 王伟 ,
  • 黎旭 ,
  • 何卫 ,
  • 袁溢 ,
  • 王芳 ,
  • 杨昌贤 ,
  • 丁祥 ,
  • 韩贺 ,
  • 李力 ,
  • 曹勇
展开
  • (1. 中国铁路经济规划研究院有限公司, 北京 100038; 2. 中铁第四勘察设计院集团有限公司, 湖北 武汉 430063; 3. 中国第一勘察设计院集团有限公司, 陕西 西安 710043; 4. 中铁二院工程集团有限责任公司, 四川 成都 610031; 5. 中国铁路设计集团有限公司, 天津 300308; 6. 中国铁路第五勘察设计院集团有限公司, 北京 102600; 7. 中铁第六勘察设计院集团有限公司, 天津 300308; 8. 中铁工程设计咨询集团有限公司, 北京 100055; 9. 中铁上海设计院集团有限公司, 上海 200070)
巩江峰(1980—),男,山西运城人,2003 年毕业于兰州交通大学,土木工程专业,本科,正高级工程师,现从事隧道工程设计、咨询、科研相关工作。E-mail: 15801688@qq.com。

网络出版日期: 2025-03-20

Statistics of China′s Railway Tunnels by the End of 2024 and Overview of Tunnels of New Projects in 2024

  • GONG Jiangfeng ,
  • WANG Wei ,
  • LI Xu ,
  • HE Wei ,
  • YUAN Yi ,
  • WANG Fang ,
  • YANG Changxian ,
  • DING Xiang ,
  • HAN He ,
  • LI Li ,
  • CAO Yong
Expand
  • (1. China Railway Economic and Planning Research Institute Co., Ltd., Beijing 100038, China; 2. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, Hubei, China; 3. China Railway First Survey and Design Institute Group Co., Ltd., Xi′an 710043, Shaanxi, China; 4. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, Sichuan, China; 5. China Railway Design Corporation, Tianjin 300308, China; 6. China Railway Fifth Survey and Design Institute Group Co., Ltd., Beijing 102600, China; 7. China Railway Liuyuan Group Co., Ltd., Tianjin 300308, China; 8. China Railway Engineering Design and Consulting Group Co., Ltd., Beijing 100055, China; 9. China Railway Shanghai Design Institute Group Co., Ltd., Shanghai 200070, China)

Online published: 2025-03-20

摘要

对截至2024年底中国铁路隧道、高速铁路隧道、特长铁路隧道情况进行统计。 结果显示,截至2024年底,中国铁路营业里程达到16.2万km,其中,投入运营的铁路隧道18 997座,总长24 246 km;2024年新增开通运营线路铁路隧道424座,总长738 km;在建铁路隧道2 521座,总长约6 905 km;规划铁路隧道5 634座,总长约13 742 km。中国已投入运营的高速铁路总长超过4.8万km,共建成高速铁路隧道4 917座,总长8 279 km,其中,长度大于10 km的特长隧道120座,长约1 536 km; 2024年新增运营有隧道工程项目的高速铁路共12条,总长1 981 km,共有隧道356座,长约544 km;在建高速铁路共58条,总长9 866 km,共有隧道1 412座,长约3 509 km;规划高速铁路项目中含隧道2 057座,长约4 843 km。中国投入运营的特长铁路隧道共296座,长约4 007 km,其中,长度20 km以上的特长铁路隧道14座,长约335 km;2024年新增运营特长铁路隧道10座,长约138 km;在建特长铁路隧道163座,长约2 504 km;规划特长铁路隧道259座,长约3 633 km。最后,对2024年新开通的重点项目佛莞城际铁路、成兰铁路、兰张三四线铁路和池黄铁路隧道的概况及特点进行介绍,并总结其技术经验。佛莞城际铁路通过地质选线,管片采用“双掺”技术、设置分布式凹凸榫等措施,有效降低了隧道施工安全风险;成兰铁路德胜隧道制定了大变形综合防治体系,并研发了双线合修隧道洞内救援站,提升了隧道变形防控和疏散救援能力;兰张三四线铁路借鉴既有施工经验,通过减灾选线和综合利用既有辅助坑道,显著降低了施工及运营期间的安全风险;池黄铁路隧道成功应用掌子面围岩质量分析技术,保障了隧道施工安全。中国在复杂环境下的大直径盾构隧道建造技术日趋成熟,应对复杂地质条件的隧道设计施工水平进一步提高,钻爆法隧道全工序机械化水平得到有效提升。

本文引用格式

巩江峰 , 王伟 , 黎旭 , 何卫 , 袁溢 , 王芳 , 杨昌贤 , 丁祥 , 韩贺 , 李力 , 曹勇 . Statistics of China′s Railway Tunnels by the End of 2024 and Overview of Tunnels of New Projects in 2024(截至2024年底中国铁路隧道情况统计及2024年新开通项目隧道情况介绍)[J]. 隧道建设, 2025 , 45(3) : 636 -653 . DOI: 10.3973/j.issn.2096-4498.2025.03.019

Abstract

The authors present statistical data on tunnels respectively on conventional railways, high-speed railways, and extra-long railways in China by the end of 2024. According to the data, China′s operating railways have reached a total length of 162 000 km by the end of 2024. Among these operating railways, there were 18 997 tunnels with a total length of 24 246 km. New railways opened for traffic in 2024 incorporated 424 tunnels, with a total length of 738 km. There were 2 521 tunnels located on railways under construction, with a total length of about 6 905 km; there were 5 634 tunnels located on railways under planning, with a total length of about 13 742 km. The total length of high-speed railways that have been put into operation in China has exceeded 48 000 km, incorporating 4 917 tunnels with a total length of 8 279 km. Among them, 120 were extra-long tunnels with a length of more than 10 km each and a total length of about 1 536 km. 12 new high-speed railways with tunnels were opened in 2024, stretching for a total length of 1 981 km and incorporating 356 tunnels, totaling about 544 km in length. There were 58 high-speed railways under construction with a total length of 9 866 km, incorporating 1 412 tunnels with a total length of about 3 509 km. The planned high-speed railways included 2 057 tunnels with a total length of about 4 843 km. China had 296 extra-long railway tunnels in operation, with a total length of about 4 007 km. Among them, 14 were extra-long tunnels over 20 km each, with a total length of about 335 km. China′s new railways opened in 2024 included 10 extra-long tunnels with a total length of about 138 km. There were 163 extra-long tunnels located on railways under construction, with a total length of about 2 504 km; there were 259 extra-long tunnels located on railways under planning, with a total length of about 3 633 km. The authors also provide an overview of tunnels located on the new key projects opened in 2024, including Foshan-Dongguan intercity railway, Chengdu-Lanzhou railway, Lanzhou-Zhangye No.3 & No.4 line high-speed railway, and Chizhou-Huangshan railway. The characteristics of these tunnels are highlighted, along with a summary of the technical experience gained from them. The Foshan-Dongguan intercity railway has adopted geological route selection and segment measures such as "double admixing technology" and distributed mortise-and-tenon structure, effectively reducing the safety risks of tunnel construction. The Desheng tunnel on Chengdu-Lanzhou railway has established a comprehensive prevention and control system for large deformation and developed a double track combined tunnel rescue station, improving the tunnel deformation prevention and control, as well as evacuation and rescue capability. The Lanzhou-Zhangye No.3 & No.4 line high-speed railway has drawn on existing construction experience, significantly reducing safety risks during construction and operation through disaster-reduction route selection and comprehensive utilization of existing service galleries. The quality analysis technology for tunnel face surrounding rock has been successfully applied in tunnels on Chizhou-Huangshan railway, ensuring the safety of tunnel construction. In complex environments, the construction technology of large-diameter shield tunnels in China will become increasingly mature. The design and construction level of tunnels under complex geological conditions will be further improved, and the all-process mechanization level of the drill-and-blast tunnels will be effectively enhanced.