为解决现有装配式地下车站施工效率不足的问题,提出一种基于型钢套筒溢浆连接的装配式两层两跨矩形框架有柱地下车站结构。该结构由单面叠合侧墙、现浇底板、预制中板、叠合顶板、预制混凝土柱组成。其中,侧墙纵筋采用型钢套筒溢浆连接,上下层预制柱钢筋采用套筒连接,预制柱与底板采用螺栓连接。采用可合理反映预制构造和钢筋连接特性的节点有限元模型建模方法,建立有柱地下车站的三维实体有限元模型。通过推覆分析重点研究中板与顶板预制板是否出筋以及埋深对装配式地下车站整体结构受力性能的影响,并与现浇结构进行对比。分析结果表明: 1)装配式地下车站与现浇车站均为混合铰破坏模式,塑性铰首先出现在中柱端部; 装配式地下车站与现浇车站荷载-位移曲线均分为弹性、屈服、峰值和极限4个阶段。2)在3 m埋深下,采用中板与顶板预制板受力筋靠纵梁侧不出筋的装配式车站整体结构抗侧刚度较采用出筋构造的整体结构低4.2%,但是否出筋对装配式车站整体结构的峰值承载力与延性影响不大,相差不到4%;
且装配式车站与现浇车站之间的峰值承载力、延性的差异均不超过6%。3)在10 m埋深下,采用中板与顶板预制板受力筋靠纵梁侧不出筋/出筋的2种不同构造的装配式车站与现浇车站之间的承载力、延性、刚度的差异均不超过7%;
相比3 m埋深,10 m埋深下整体结构的承载力与刚度分别提高10.5%~12.7%和31.8%~46.3%,但延性降低14.5%~18.7%。总体上,该装配式有柱地下车站整体结构具有良好的受力性能,中板与顶板预制板受力筋靠纵梁侧是否出筋对车站整体结构受力性能影响不大。
To address the low construction efficiency of existing
prefabricated underground stations, the authors propose a column-supported,
two-story, two-span assembled
rectangular frame structure that utilizes steel-to-sleeve connections with overflowed grout technology. The structure
comprises single-sided composite sidewalls, a cast-in-place bottom slab, prefabricated middle
slabs, composite top slabs, and prefabricated concrete columns. The
longitudinal reinforcement of the sidewalls employs steel-to-sleeve connections with overflowed grout.
Meanwhile, the reinforcements of the prefabricated columns on the upper and
lower floors use sleeve connections and are bolted to the bottom slab. A three-dimensional solid finite element model of the underground station
was developed using a finite element modeling approach. This model accurately
represents the characteristics of the prefabricated components and rebar
connections. Through pushover analysis, the authors examine how the presence of
embedment depth of longitudinal reinforcement extending from the middle and top
prefabricated slabs into the sides of the longitudinal beams affects the
mechanical performance of the prefabricated underground station. The obtained
results are compared with those of a traditional cast-in-place structure. The analysis yields the following findings: (1) The
prefabricated and cast-in-place
underground stations exhibit a mixed hinge failure mode, with plastic hinges
initially appearing at the ends of the middle columns. The load-displacement curve can be divided into four stages: elastic, yield,
peak, and ultimate. (2) At a burial depth of 3 m, the overall lateral stiffness of the prefabricated structure,
without extended reinforcement at the longitudinal beam sides of the middle and
top slabs, is 4.2% lower than that of the structure with extended
reinforcement. However, the presence of extended reinforcement has minimal
effect on the peak load-bearing capacity and ductility
of the prefabricated structure, with differences of <4%. Furthermore, the
differences in peak load-bearing capacity and ductility
between the prefabricated and cast-in-place stations are <6%. (3) At a burial depth of 10 m, the
differences in load-bearing capacity, ductility, and
stiffness between the prefabricated and cast-in-place structures are <7%. Compared to the structure at a 3 m depth, the structure at a 10-m depth
exhibits increases of 10.5%-12.7% in load-bearing capacity and 31.8%-46.3% in
stiffness, but a decrease of 14.5%-18.7% in ductility.
Overall, the proposed prefabricated underground station structure with columns
demonstrates favorable mechanical performance. The extension of longitudinal
reinforcement from the middle and top slabs into the longitudinal beam sides
has limited impact on the overall structural behavior.