• CSCD核心中文核心科技核心
  • RCCSE(A+)公路运输高质量期刊T1
  • Ei CompendexScopusWJCI
  • EBSCOPж(AJ)JST
二维码
监控与维护

在役隧道防火涂料运营状态评估方法及处治对策研究

  • 李玉豪 ,
  • 王海林 ,
  • 焦澳 ,
  • 王建华 ,
  • 范传刚 ,
  • 张果 ,
  • 程瑞琦
展开
  • (1. 湖南省交通规划勘察设计院有限公司, 湖南 长沙 410200; 2. 中南大学土木工程学院, 湖南 长沙〓410075)
李玉豪(1998—),男,湖南邵阳人,2023年毕业于中南大学,消防工程专业,硕士,工程师,现从事消防设计及火灾科学研究工作。 E-mail: 2675359434@qq.com。 *通信作者: 焦澳, E-mail: jiaoao_96@csu.edu.cn。

网络出版日期: 2025-05-20

Operational State Assessment and Treatment Strategies for Existing Fire-Retardant Coatings in Highway Tunnels

  • LI Yuhao ,
  • WANG Hailin ,
  • JIAO Ao ,
  • WANG Jianhua ,
  • FAN Chuangang ,
  • ZHANG Guo ,
  • CHENG Ruiqi
Expand
  • (1. Hunan Provincial Communications Planning, Survey & Design Institute Co., Ltd., Changsha 410200, Hunan, China; 2. School of Civil Engineering, Central South University, Changsha 410075, Hunan, China)

Online published: 2025-05-20

摘要

通过调研湖南省武深高速、宁靖高速、邵坪高速等16条高速公路的隧道洞内防火涂料的运营情况,发现湖南省存在大量采用防火涂料的在役隧道,涂层厚度为12~20 mm,且82%的隧道存在防火涂料脱落情况,危害行车安全。针对缺少在役隧道防火涂料运营状态评估方法及病害处治对策的现状,基于现行防火涂料标准给出的关键性能指标和湖南省公路隧道防火涂料实际运营现状,构建包含脱落面积率、脱落频率、鼓包面积率、裂缝综合评价指标和隧道平均日交通量等评价指标的涂料运营现状评估体系,并结合涂料病害类型及发生发展机制,提出在役防火涂料不同运营状态等级对应的处治对策。通过对排沙坪隧道左洞开展现场评估,得出该隧道在役防火涂料运营状态值为85.20,状态等级为良好,与3家检测评估单位给出的评估结果一致。

本文引用格式

李玉豪 , 王海林 , 焦澳 , 王建华 , 范传刚 , 张果 , 程瑞琦 . 在役隧道防火涂料运营状态评估方法及处治对策研究[J]. 隧道建设, 2025 , 45(5) : 1018 -1026 . DOI: 10.3973/j.issn.2096-4498.2025.05.017

Abstract

The authors investigate the operational state of fire-retardant coatings in tunnels on 16 highways in Hunan Province, China. Numerous in-service tunnels are equipped with fire-retardant coatings, with thicknesses ranging from 12 to 20 mm. In 82% of the tunnels, the coatings have shed, posing a safety risk to tunnel traffic. However, assessment methods and treatment measures for evaluating the operational state of these in-service fire-retardant coatings remain limited. Based on the key performance indices outlined in relevant fire-retardant coating standards and the actual operational states observed in highway tunnels in Hunan Province, a coating operational state assessment model is developed. This model incorporates evaluation indices such as the shedding area rate, shedding frequency, bulging area rate, crack length and number, and average daily tunnel traffic flow. In addition, the types of coating defects, along with their occurrence and development mechanisms, are analyzed, and treatment measures are proposed for different operational state levels of existing fire-retardant coatings. A field assessment test conducted on the Paishaping tunnel yields an operational state value of 85.20—classified as a good level—which aligns with the assessment results provided by three independent testing and assessment units.
文章导航

/

〈 〉