堡镇隧道软岩高地应力地层大变形控制关键技术

展开
  • 1.中铁隧道集团有限公司 2.铁道部宜万铁路建设指挥部
王水善(1965—)|男|2005年毕业于石家庄铁道学院土木工程专业|本科|工程师|从事隧道与地下工程施工和管理工作。

收稿日期: 2008-12-22

  修回日期: 2009-03-23

  网络出版日期: 2009-11-17

Key Technology to Control Serious Deformations of Soft Rock Stratum with
High Ground Stress: Case Study on Baozhen Tunnel

Expand
  • 1. China Railway Tunnel Group Co., Ltd.2. YichangWanzhou Railway Construction Headquarters of Ministry of Railways

Received date: 2008-12-22

  Revised date: 2009-03-23

  Online published: 2009-11-17

摘要

宜万线堡镇隧道施工中遇到高地应力软岩大变形,开挖地质情况与设计不符,初期支护变形严重等问题,为了安全顺利通过此段,施工中采用了先柔后刚、先放后抗、多重支护,提高二次衬砌刚度和超短台阶等支护措施,有效控制了围岩大变形。为了更好地控制变形,采用了变形预测程序,通过对预测值和实测值比较,证实了预测软件具有较好的可靠性。通过变形量测资料及时调整支护参数,顺利通过了高地应力软岩段。

本文引用格式

王水善 . 堡镇隧道软岩高地应力地层大变形控制关键技术[J]. 隧道建设, 2009 , 29(2) : 227 -231 . DOI: B

Abstract

 During the construction of Baozhen tunnel on YichangWanzhou railway, serious deformation of soft rocks with high ground stress, unconformity between excavationrevealed geological conditions and the designed geological conditions and severe support distortions happen. In order to ensure the successful tunneling through this section, countermeasures including installing flexible support before the installation of the rigid support, stress releasing before stress resisting, installing multilayer supports, improving the rigidness of the secondary lining and adopting supershort benches are taken, which brings the serious deformation of the surrounding rock mass under control. In order to better control the deformation, deformation predicting program is adopted. The comparison between the predicted values and the measured values shows that the software has a good reliability. By means of timely adjusting the support parameters according to the monitoring data, the tunneling successfully passes through the section.