为解决大帽山新建隧道爆破对既有隧道结构的影响,采用分步钻爆开挖、楔型掏槽、炮孔堵塞等一系列技术措施,控制了爆破振动速度,同时还确定了大断面小净距隧道不同围岩中的爆破振动控制标准,此标准比类似隧道的标准大有提高。
关键词: 特大断面隧道紧邻运营隧道爆破振动控制技术
吴超凡 . 特大断面小净距隧道爆破振动控制技术[J]. 隧道建设, 2009 , 29(2) : 232 -234,238 . DOI: B
A series of countermeasures, such as sequential excavation by means of drilling and blasting, wedge cut and shot hole stemming, are adopted in order to minimize the impact on the existing tunnel structure caused by the blasting made during the construction of Damaoshan tunnel. Due to the countermeasures taken, the blasting vibration velocity is brought under control. Blasting vibration control standard for different surrounding rocks of large crosssection and closelyspaced tunnels is determined, which is stricter than that for similar tunnels.
/
| 〈 |
|
〉 |