- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2008-11-19
修回日期: 2009-02-06
网络出版日期: 2009-11-17
Application of Integrated Grounding Connection in the Design of
Grounding and Safety of Metro Stations
Received date: 2008-11-19
Revised date: 2009-02-06
Online published: 2009-11-17
依据武汉地铁二号线车站接地与安全设计的工程实践,介绍地铁车站综合接地的要求以及接地装置的典型布置;运用比较分析,讨论了接地装置的组成内容、材料选择和施工方法,并对一些重点和难点问题提出了解决方案和建议。
关键词: 地铁接地与安全综合接地装置接地网接地引出线
蔡明忠,刘昌林 . 地铁车站接地与安全设计中综合接地装置的应用[J]. 隧道建设, 2009 , 29(1) : 65 -67,71 . DOI: B
On basis of the design of the grounding and safety of stations on No.2 Line of Wuhan Metro, the authors present the requirements of integrated grounding and the typical layout of the grounding connection. They also discuss the composition, material selection and construction method of grounding connection by means of comparative analysis. Finally, they put forward some solutions and suggestions for some important issues.
/
| 〈 |
|
〉 |