- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2007-09-24
修回日期: 2007-12-13
网络出版日期: 2009-11-18
Tunneling across Deep Weathered Channel: Case Study on
Xiang’an Subsea Tunnel in Xiamen, China
Received date: 2007-09-24
Revised date: 2007-12-13
Online published: 2009-11-18
根据厦门翔安海底隧道过风化深槽施工的工程实践经验,介绍了在可能发生灾害性的突泥、突水、塌方和诱发地面塌陷而导致海水下灌等地质灾害的情况下,如何采取超前地质预报、设置防水闸门、超前管棚及全断面帷幕注浆等施工辅助措施,从而保证了过风化深槽施工的顺利进行。
赵太东 . 厦门翔安海底隧道过风化深槽施工[J]. 隧道建设, 2008 , 28(1) : 66 -69,81 . DOI: B
On basis of the engineering practical experience in the crossing of the deep weathered channel of Xiang’an subsea tunnel in Xiamen, China, the author presents such assistant construction measures as advance geology forecasting, waterresistant gate installing, large pipe roof construction and fullface curtain grouting that are taken with such risks as disastrous mud burst, water burst, collapse, ground subsidence and sea water inflow. Due to the abovementioned measures, the tunnel crosses the deep weathered channel successfully.
/
| 〈 |
|
〉 |