Case Study on Construction Joint Waterproofing
Methods of Beijing Metro Works
Received date: 2007-08-24
Revised date: 2007-11-01
Online published: 2009-11-18
孟海峰 . 北京地铁施工缝防水处理方法[J]. 隧道建设, 2008 , 28(1) : 85 -88 . DOI: B
The construction joint Waterproofing methods of Metro works that are at present in use are described and compared in detail. The advantages and disadvantages of the Waterproofing methods are analyzed in terms of Waterproofing construction and Waterproofing effect. Three construction joint Waterproofing methods, i.e., Waterproofing by means of double expandable caulking glues and grouting pipes, Waterproofing by means of steeledged rubber water stripes and Waterproofing by means of prefabricated expandable rubber water stops, are presented. The material performances, installation methods, Waterproofing principles and application scopes of the mentioned three Waterproofing methods are described in the paper.
/
| 〈 |
|
〉 |