Translation and Reinforcement of Left Tgirder of Existing Wenfan
Bridge on WuKang Doubletrack Railway Project
Received date: 2007-09-03
Revised date: 2007-10-24
Online published: 2009-11-18
根据既有文畈大桥左线T梁平移和加固设计,并结合现场的实际情况,有针对性的提出了梁体平移及加固方案,并对施工工艺进行了阐述;由于是既有线施工,同时对施工过程中采取的安全措施、人员防护和机具配备等情况进行了介绍。
关键词: 既有大桥T梁平移加固方案
宋海涛 . 武康铁路二线既有文畈大桥左线T梁平移及加固[J]. 隧道建设, 2008 , 28(1) : 105 -109 . DOI: B
A translation and reinforcement plan is proposed for the left Tgirder of the existing Wenfan bridge on basis of the design and actual conditions of the job site. For the sake of construction of existing railway, the safetyguarantee measures, labor protection and equipment matching for the construction are also expounded.
/
| 〈 |
|
〉 |