Material Transportation Optimization for TunnelConstruction
Received date: 2007-09-14
Revised date: 2008-01-10
Online published: 2011-08-17
徐华升,郑国用 . 隧道施工中的运输优化[J]. 隧道建设, 2008 , 28(2) : 151 -153,185 . DOI: A
By establishing the construction material delivery planning modeland by solving the model, the optimaldelivery plan can be achieved under the condition without considering the time factor and considering the time factor respectively. In tunnel construction practices, this kind of optimal delivery plan can save a large amount of delivery fees and transportation time and as result can shorten the construction period.
/
| 〈 |
|
〉 |