上海西藏南路越江隧道穿越M8线地铁区间隧道工程稳定性的理论计算与分析
收稿日期: 2008-02-21
修回日期: 2008-06-02
网络出版日期: 2009-11-23
Theoretical Calculation and Analysis on Works Stability:
Case Study on South Tibet Road Rivercrossing Tunnel
Passing Underneath M8 Metro Running Tunnel in Shanghai
Received date: 2008-02-21
Revised date: 2008-06-02
Online published: 2009-11-23
通过模拟计算大型泥水盾构2次穿越已建成地铁隧道过程,得出大直径隧道掘进施工时既有地铁隧道的纵向位移、抗浮及隧道衬砌结构影响数据,并通过计算分析结果提出减小对已建隧道影响程度的加固措施,以达到对地铁隧道的保护目的。
关键词: 越江隧道土体损失位移轴力弯矩
杜峰 . 上海西藏南路越江隧道穿越M8线地铁区间隧道工程稳定性的理论计算与分析[J]. 隧道建设, 2008 , 28(4) : 403 -407 . DOI: A
The influence of the boring of largediameter shield machines on the longitudinal displacement, antifloating performance and lining structure of the existing Metro running tunnel is obtained by means of simulation of the twice passing of the large slurry shield machines underneath the existing Metro running tunnel. Consolidation measures are proposed on basis of the calculation and analysis results to minimize the influence on the existing Metro running tunnel so as to protect the Metro running tunnel from being damaged.
/
| 〈 |
|
〉 |