- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2008-03-25
修回日期: 2008-05-16
网络出版日期: 2009-11-23
Comparison of Construction Schemes for Conversion from
Horizontal Adit Driving to Main Tunnel Driving
Received date: 2008-03-25
Revised date: 2008-05-16
Online published: 2009-11-23
针对城市地铁竖井横通道转正洞施工难度大、工序繁杂的特点,通过方案比选,提出竖井横通道转正洞采用大包施工工法。该工程现已顺利竣工,工程实践表明,大包法施工安全可靠,技术经济和社会效益显著,可供类似工程参考。
李静 . 竖井横通道转正洞施工方案比选[J]. 隧道建设, 2008 , 28(4) : 476 -478 . DOI: B
The conversion from horizontal adit driving to main tunnel driving of Metro works has great construction difficulties and complex construction procedures. It is proposed, on basis of construction scheme comparison, that full-envelope construction method should be adopted for the conversion from horizontal adit driving to main tunnel driving. The works has already been successfully completed. The works practice demonstrates that full-envelope construction method can provide safe and reliable construction and significant technical, economical and social benefits. The paper can provide reference for similar works in the future.
/
| 〈 |
|
〉 |