以重庆天府矿业有限公司磨心坡煤矿提升斜井为例,采用有限差分的方法,研究斜井在不同支护体系下的力学行为,分析了斜井在使用阶段对磨心坡车站的影响,既符合一切服从铁路的原则,又达到对斜井的衬砌方案提出有益参考的目的。
关键词: 煤矿提升斜井有限差分铁路影响
刘杰伦 , 叶勤俭 . 磨心坡煤矿提升斜井对襄渝铁路相关地段的影响分析[J]. 隧道建设, 2007 , 27(2) : 28 -31 . DOI: A
Taking the inclined hoisting shaft of Moxinpo coal mine of Tianfu Mining Co., Ltd. in Chongqing as project case, the paper studies on the mechanical behavior of the inclined shaft under different reinforcement systems and analyzes the impacts on Moxinpo station imposed by the inclined shaft during its operation by means of finite difference solution method. In the end, all the requirements of the railway are completely satisfied and helpful reference is provided for the determination of the lining of the inclined shaft.
/
| 〈 |
|
〉 |