Dynamic Analysis on Construction of Large Crosssection
Tunnel Adjacent to Existing Metro Line
Received date: 2006-12-14
Revised date: 2007-01-11
Online published: 2009-12-03
对大断面隧道近距离穿越既有结构的施工状况进行了统计,并结合现场采集的大量监测数据,对施工动态进行了详细的分析,可为类似的工程提供借鉴。
关键词: 大断面隧道近接既有线施工变形监测
王刚 . 大断面隧道近接既有线施工变形分析[J]. 隧道建设, 2007 , 27(2) : 36 -39 . DOI: B
On basis of the statistics of construction of large crosssection tunnels crossing directly underneath existing Metro lines and the large number of monitoring data obtained in the job site, the author makes detailed analysis on the construction dynamics so as to provide reference for other similar works.
/
| 〈 |
|
〉 |