针对在繁华城区中采用侧洞法进行大断面地铁车站施工的情况,进行了地表沉降、拱顶下沉、收敛变形、应力变化等方面的量测。根据量测情况对施工变形情况进行了详细的分析,初步总结了侧洞法施工大断面隧道的变形规律,为后续工程提供了借鉴。
关键词: 侧洞法大断面隧道监测施工变形
高军 . 侧洞法修建大断面隧道施工变形分析[J]. 隧道建设, 2007 , 27(2) : 32 -35 . DOI: B
For the construction of a large crosssection Metro station in busy urban area by means of side drift method, monitoring is made on surface subsidence, crown settlement, convergence, displacement and stress variations. On basis of the monitoring results, detailed analysis is made on deformation resulted by construction activities and a preliminary summary is made on the deformation pattern of construction of large crosssection tunnels by means of side drift method.
/
| 〈 |
|
〉 |