Key Construction Technologies and Countermeasures for
Largescale Mined Interchange Metro Stations
Received date: 2007-05-10
Revised date: 2007-06-07
Online published: 2009-12-04
结合沈阳地铁青年大街站工程实际,介绍了暗挖洞桩法的主要施工步骤及要点。青年大街站结构复杂,洞桩法施工增加了工程的安全性和稳定性,可减少施工产生的变形,有效保护临近建(构)筑物。
关键词: PBA工法地模钢管柱钻孔桩施工
陈涛 , 董小龙 . 暗挖大型换乘地铁车站施工关键技术及对策[J]. 隧道建设, 2007 , 27(3) : 71 -74,91 . DOI: B
Taking the construction of Youth Street Station of Shenyang Metro as case history, the author presents the major construction steps and key points of PBA (PileBeamArch) construction method. Due to the complex structure of the Metro station, PBA (PileBeamArch) construction method is adopted, which improves the safety and stability of the works, minimizes the deformation occurring during construction and protects the adjacent structures and buildings effectively.
/
| 〈 |
|
〉 |