Application of Horizontal Material Flow Crushing Technology in
Muck Discharging during Long Tunnel Construction
Received date: 2006-12-08
Revised date: 2007-02-06
Online published: 2009-12-04
长距离隧道建设中的出渣工序直接影响着长距离隧道建设的连续性和运输成本;水平物流破碎技术,配套皮带运输系统的应用很好地优化了爆破废料的清运工序,同时因为卡车使用的减少,降低了施工中通风和安全压力。
徐北锋 , 常宇军 . 水平物流破碎技术在长距离隧道出渣中的应用[J]. 隧道建设, 2007 , 27(4) : 55 -56,78 . DOI: B
Muck discharging has direct impact on the continuity and cost of the construction of long tunnels. Horizontal material flow crushing technology, assisted with belt conveyor transportation system, can optimize the muck discharging process. Furthermore, the ventilation and safety problems in the tunnel construction can be mitigated due to the less use of trucks.
/
| 〈 |
|
〉 |