Construction Technology for Fillingtype Waterrich
Karst Caves in No.1 Dayaoshan Tunnel
介绍了武广铁路客运专线大瑶山一号隧道正洞施工至DK1909+624,进入F6断层时,掌子面发生大规模涌水涌泥,经观察隧道右侧为一巨型富水充填性溶洞,施工中严格按照“先探水、预注浆、再管棚、后开挖、径向补注浆、快衬砌”的总体施工原则组织施工,采取“排堵结合”的方法,安全、快速地通过了此溶洞。
吴海之 . 大瑶山1#隧道富水充填性溶洞施工技术[J]. 隧道建设, 2007 , 27(5) : 72 -74,84 . DOI: B
Large scale water/mud inflow occurs at the face of No. 1 Dayaoshan tunnel on Wuhan~Guangzhou passengerdedicated railway when the construction of the tunnel reaches DK1909+624 and enters F6 fault. It is observed that a large fillingtype waterrich karst cave exists on the right side of the tunnel. The construction of the tunnel is carried out strictly in accordance with the principle of “water probing, pregrouting and installing forepoling pipe roofs, which are followed by tunnel excavation, radial compensation grouting and quick lining”. The concept of “drainage assisted by waterproofing” is adopted. For the sake of these principles and concepts adopted, the construction of the tunnel passes the karst cave with safety and high speed.
/
| 〈 |
|
〉 |