Study on Design of TBM Assemble Cavern of Drain
Tunnel in JinpingⅡ Hydropower Project
Received date: 2007-10-26
Revised date: 2007-11-01
Online published: 2009-12-06
Due to the rigorous time limit of drain tunnel in JinpingII Hydropower Project, compact plane layout that can satisfy the requirements of quick TBM assemble is designed for the TBM assemble cavern, minimal crosssection that can satisfy the assemble is designed, reinforcement pattern consisting of rock bolts, shotcreting and wire meshing is designed. The design plan of the TBM assemble cavern is favorable for the ontime boring the TBM.
关键词: 锦屏二级水电站施工排水洞TBM组装洞设计研究
苏利军 , 刘立新 . 锦屏二级水电站施工排水洞TBM组装洞设计研究[J]. 隧道建设, 2007 , 27(6) : 36 -38 . DOI: B
Due to the rigorous time limit of drain tunnel in JinpingII Hydropower Project, compact plane layout that can satisfy the requirements of quick TBM assemble is designed for the TBM assemble cavern, minimal crosssection that can satisfy the assemble is designed, reinforcement pattern consisting of rock bolts, shotcreting and wire meshing is designed. The design plan of the TBM assemble cavern is favorable for the ontime boring the TBM.
/
| 〈 |
|
〉 |