- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
Slurry Shield Construction Technology for Launching Section of
South Railway Station~Provincial Stadium
Running Tunnel of Chengdu Metro
采用盾构法进行富水砂卵石地层的施工,在全国尚属首次,介绍了成都地铁盾构4标始发段的掘进情况,对泥水盾构机在富水砂卵石地层中的施工技术进行了初步探讨,可供类似工程参考。
杨书江 . 成都地铁火车南站—省体育馆站区间隧道始发段泥水盾构施工技术[J]. 隧道建设, 2007 , 27(6) : 43 -46 . DOI: B
It is the first time in China that shield tunneling methed is used in waterrich cobble ground. In the paper, the boring of the shield in the lannching section of No.4 bid section in Chengdu Metro is presented and prelimirary discussions are made on the construction technology of shurry shields in waterrich cobble ground. The paper can provide reference for similar works in the future.
/
| 〈 |
|
〉 |