Construction Technology for EPB Shield Crossing Xinzaohai
under Complex Geological Conditions
Received date: 2007-11-06
Revised date: 2007-11-15
Online published: 2009-12-06
随着城市轨道交通的发展,盾构施工在地铁隧道建设得到较快的发展和应用,结合工程实践,介绍了广州地铁四号线小新区间穿越新造海(510m)隧道的关键性施工技术,该工程的成功实施,对以后类似过江隧道施工具有借鉴意义。
关键词: 土压平衡盾构过江施工技术掘进参数带压进仓
王明胜 , 徐军哲 , 倪冰玉 . 复杂地质条件下盾构法穿越新造海施工技术[J]. 隧道建设, 2007 , 27(6) : 52 -56,62 . DOI: B
With the development of urban rail transit, shield tunneling method has achieved rapid development in Metro construction. With reference to the practice of engineering project, the author mainly elaborates the critical technology for EPB shield tunneling crossing Xinzaohai (510m) in Xiaoxin section of line 4 of Guangzhou Metro. The successful execution of this project could give reference for similar works crossing seas in the future.
/
| 〈 |
|
〉 |