Design and Construction of Fullbreadth Invert Bridges Adopted in
Construction of Baozhen Tunnel with Railbound Hauling System
Received date: 2005-12-05
Revised date: 2006-01-25
Online published: 2009-12-09
结合宜万铁路堡镇隧道施工实际,介绍在有轨运输条件下,全幅仰拱桥设计与施工的情况。在目前所配备的施工机械设备前提下,解决了仰拱分段一次浇注的难题,为今后全面推广全幅仰拱施工、根治隧道运营病害提供参考。
张群健 . 堡镇隧道有轨运输全幅仰拱桥设计与施工[J]. 隧道建设, 2006 , 26(2) : 27 -29 . DOI: B
On basis of the construction of Zhenbao tunnel on YichangWanzhou railway, the article introduces the design and construction of fullbreadth invert bridges adopted in the construction of the tunnel, in which railbound hauling system is adopted. By means of the introduced invert bridge, fullbreadth invert concrete casting is conducted with the present machinery and equipment. The article provides references both for the promotion of fullbreadth invert concrete casting and for the elimination of the operation diseases of tunnels.
/
| 〈 |
|
〉 |