Construction Technology of Doublearched Tunnels
Received date: 2005-12-06
Revised date: 2006-03-01
Online published: 2009-12-09
双连拱隧道在结构上与单拱隧道有较大区别,近年来逐渐被应用于高等级公路中。如何在其施工过程中把握要点,吸取经验教训,逐渐熟悉并掌握其施工工艺有着非常重要的意义。通过介绍元磨及思小高速公路隧道施工过程中的工艺控制,就双连拱隧道的结构特点、中导洞及三导洞开挖方法、衬砌施工、特殊问题的处理等内容,提出了看法及建议。
胡红卫 . 连拱隧道施工工艺[J]. 隧道建设, 2006 , 26(3) : 36 -39 . DOI: B
Doublearched tunnels, which have been adopted in highway works in recent years, have great difference from singlearched tunnels in respect of tunnel structures. Therefore, it is of great significance to understand the key points of doublearched tunnels and to learn from relevant experience and lessons so as to grasp the construction technology of doublearched tunnels. Taking the doublearched tunnels on YuanMo highway and SiXiao highway as example, the article expatiates on the structural features, central drift excavation method, threedrift excavation method, lining construction and some special issues of doublearched tunnels.
/
| 〈 |
|
〉 |