Analysis on Rapid Excavation Technology
Applied in Inclined Shaft of Dabieshan Tunnel
Received date: 2006-01-13
Revised date: 2006-04-10
Online published: 2009-12-09
汤宪高 , 高伟 , 罗治军 . 大别山隧道斜井快速掘进技术分析[J]. 隧道建设, 2006 , 26(3) : 55 -57,103 . DOI: B
The article gives a detailed analysis on the initial poor excavation construction of the inclined shaft of Dabieshan tunnel on Hefei~Wuhan passengerdedicated railway. On basis of the existing problems, the article recommends some countermeasures, which result in higher advance rate, reduced cycle time, minimum overbreak/shortbreak, decreased construction period and reduced cost.
/
| 〈 |
|
〉 |