Comparison of Different Operation Ventilation
Options for Longtan Superlong Highway Tunnel
Received date: 2005-11-28
Revised date: 2006-03-06
Online published: 2010-04-21
建设中的龙潭隧道系沪蓉国道主干线宜昌至恩施公路上的特长隧道,长约2×8.7km,其营运通风系统值得认真研究。结合工程实际情况,从通风、防灾救援和施工组织等因素综合考虑,经技术经济比选,确定了技术相对可靠、经济较省的营运通风方式。
关键词: 特长公路隧道 营运 通风方案
陈光明 , 陈璋 , 胡益华 . 龙潭特长公路隧道营运通风方案比较[J]. 隧道建设, 2006 , 26(4) : 20 -24 . DOI: B
Longtan tunnel under construction is a superlong highway tunnel of about 2×8.7km length on Yichang~Enshi section of the national highway from Shanghai to Chengdu. The operation ventilation system of Longtan tunnel requires careful researches. On basis of the actual conditions of the tunnel, a technicallyreliable and costeffective operation ventilation option is determined for the tunnel by means of technic and economic comparisons in terms of ventilation efficiency, disaster prevention, emergency rescue and construction convenience.
/
| 〈 |
|
〉 |