- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2009-08-03
修回日期: 2009-09-21
网络出版日期: 2009-12-08
Construction and Cost of ⅠType Slab Ballastless Track in Extralong
Tunnels on ShijiazhuangTaiyuan Passengerdedicated Railway
Received date: 2009-08-03
Revised date: 2009-09-21
Online published: 2009-12-08
蒋奎 , 肖琪蓉 , 江吉兵 . 石太客运专线特长隧道Ⅰ型板式无砟轨道施工与造价[J]. 隧道建设, 2009 , 29(5) : 543 -547 . DOI: B
In order to meet the rapid development of passengerdedicated railways and popularizeⅠtype slab ballastless tracks, the key technologies for construction of ballastless tracks in extralong tunnels, including logistics organization, construction survey, base concrete casting, slab laying and track laying, as well as construction cost, are analyzed in detail in this paper, on basis of the successful experience of construction of Ⅰtype slab ballastless track in Taihangshan extralong tunnel on ShijiazhuangTaiyuan passengerdedicated railway. The standardized construction technology of Ⅰtype slab ballastless tracks in extralong tunnels on passengerdedicated railways can provide reference for the popularization of ballastless tracks in long tunnels on passengerdedicated railways and for the construction of ballastless tracks in urban mass rapid transit works in the future.
/
| 〈 |
|
〉 |