Case Study on Arriving Construction Technology of Slurry Shield
Machine with Superlarge Diameter
Received date: 2009-08-27
Revised date: 2009-10-09
Online published: 2009-12-08
杨纪彦 . 超大直径泥水盾构到达施工技术[J]. 隧道建设, 2009 , 29(5) : 548 -551,557 . DOI: B
As one of the crucial procedures of shield boring, the arriving of shield machines with superlarge diameters is complicated in technology and has great risks. Taking the arriving of the shield machine for Nanjing Yangtze River Tunnel as an example, the author presents the comprehensive construction measures, including the portal section reinforcement by mixing piles, dewatering, freezing and water & soil filling in shield arriving shaft. The above measures guarantee the safe arriving of the superlarge diameter slurry shield under the condition of shallow cover and highly permeable ground. This paper can provide reference for similar projects in the future.
/
| 〈 |
|
〉 |