Fullface Advance Grouting for Water Sealing and Reinforcement of Karst Section of Xiangshan Tunnel
Received date: 2009-07-13
Revised date: 2009-10-10
Online published: 2009-12-08
韩志怀 . 象山隧道岩溶地段全断面超前注浆堵水与加固技术[J]. 隧道建设, 2009 , 29(5) : 558 -562 . DOI: B
The engineering geology and hydrogeology of the karst section of Xiangshan tunnel on LongyanXiamen railway is presented. The fullface advance grouting technology for karst area, including grouting parameters, grouting materials, grouting procedure, grouting technique, grouting equipment and grouting effect assessment, are described, with the grouting in YDK24+114~+144 section of Xiangshan tunnel as an example. This paper can provide reference for similar projects in the future.
/
| 〈 |
|
〉 |