Discussion on Rapid Construction of Large Crosssection Tunnels on
Passengerdedicated Railways Located in Soft Ground
Received date: 2009-03-29
Revised date: 2009-09-11
Online published: 2010-01-04
陈庆怀,姜永涛 . 大断面客专隧道软弱围岩快速施工探讨[J]. 隧道建设, 2009 , 29(增刊2) : 18 -23,44 . DOI: B
The rapid construction of tunnels in soft ground is an issue that needs to be solved urgently. In China, due to the lack of advanced equipment, the issue can only be solved by changing the construction method. Practices show that the minibench construction method is a relatively good method for construction of tunnels in soft ground. Diaogouling tunnel on WuhanGuangzhou passengerdedicated railway, located in Hengyang and Chenzhou of Hunan province, is the second longest tunnel in XXTJIV bid section. The tunnel is characterized by high design standard (with 350km/h train running speed), large excavation crosssection (with 150m2 excavation crosssection area) and complex geologies (including long distance of soft ground, numerous faults and fullydeveloped karst). Taking the construction of Diaogouling tunnel as an example, the authors discuss the construction methods and construction technologies for the rapid construction of large crosssection tunnels in soft ground in this paper, which can provide reference for similar projects in the future.
/
| 〈 |
|
〉 |