Management of Rapid Construction of Tunnels on
Passengerdedicated Railways
Received date: 2007-01-18
Revised date: 2007-03-02
Online published: 2010-01-05
针对客运专线隧道如何提高施工进度,制定了相应的管理办法和制度,并将其运用到石太客运专线太行山隧道8号斜井工区的施工管理中,收到了很好的经济效果。
吴志刚 , 王军涛 . 客运专线隧道快速施工管理[J]. 隧道建设, 2007 , 27(增刊1) : 80 -82 . DOI: B
In order to improve the construction advance rates of the tunnels on passengerdedicated railways, relevant management methods and stipulations are made and are applied into the construction management of the working lot of No. 8 inclined shaft of Taihangshan tunnel on Shijiazhuang~Taiyuan passengerdedicated railway and good economic results are achieved.
/
| 〈 |
|
〉 |