- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2006-11-23
修回日期: 2006-12-04
网络出版日期: 2010-01-08
Study on Numerical Simulations of Performance
of Tunnel Boring Machines (TBM)
Received date: 2006-11-23
Revised date: 2006-12-04
Online published: 2010-01-08
介绍了TBM(隧道掘进机)性能预测模型的研究状况、滚刀的切削力计算模型以及掘进参数的计算方法。编制了TBM掘进性能预测程序,可以对每个滚刀的切削深度、切削槽断面积、切削体积、切削槽形状、切削力、刀盘扭矩、推力、纯掘进速度、不平衡力等参数进行计算。运用预测程序对秦岭隧道TB880E型隧道掘进机性能进行了模拟预测,并与实际施工性能参数进行了验证对比。结果表明,模型的计算精度高,预测结果合理。预测模型可用于优化TBM刀具布置、验算TBM刀盘不平衡力以及预测TBM施工性能参数。
张厚美 . TBM的掘进性能数值仿真研究[J]. 隧道建设, 2006 , 26(增刊2) : 1 -7 . DOI: A
The status of the studies on TBM (tunnel boring machine)performance prediction models is presentedand the calculation models for the cutting forces of thedisc cutters and the calculation methods for the boring parameters are described in the paper. ATBM boring performance prediction modelis established, by which suchparameters ofdisc cutters ascuttingdepths, crosssectional areas of cutting grooves, cutting volumes,shapes of cutting grooves, cutting forces, cutter head torques, thrustforces, net penetration rates and eccentric forces can be calculated. The prediction model is usedin the simulation ofthe performance of TB880E TBMs used for the construction of Qinling tunnel. Acomparison is made between the prediction results and the actual performance of TB880E TBMs in the field, which demonstrates that the prediction model has high calculation accuracy and the prediction results are reasonable. The prediction modelcan be used to optimize the arrangementof the disc cutters of TBMs,to verify the eccentric force of TBM cutterheads and to predict the boring performance of TBMs.
/
| 〈 |
|
〉 |