- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2007-03-19
修回日期: 2007-06-04
网络出版日期: 2010-04-20
Selection of Lift Equipment in Deep and
Large Foundation Pit of Metro Station
Received date: 2007-03-19
Revised date: 2007-06-04
Online published: 2010-04-20
结合明挖地铁车站基坑的宽度、深度和场地条件,着重阐述了不同设备的起吊性能、效率、经济性及安全性对比。可为今后类似工程提升设备选型提供借鉴。
闫发荣 . 地铁车站深基坑、大跨度吊运设备选型[J]. 隧道建设, 2007 , 27(增刊) : 593 -595 . DOI: B
Based on the width, the depth and the ground condition of the opencut foundation pit of metro station, the economy, efficiency, security of different lift equipment are discussed, which can provides some suggestions for selection of lift technique in the future similar projects.
/
| 〈 |
|
〉 |