Design and Construction of Shallow Power Tunnels Connected with Existing Power Ditches
Received date: 2007-03-19
Revised date: 2007-06-04
Online published: 2010-04-20
北京雍和宫新建电力隧道与既有电力沟采用“暗三通”相接,成功避免了管线改移及占用交通道路。介绍了“暗三通”的设计方案及施工技术要点。
申庆梦 . 超浅埋电力隧道与既有电力沟采用暗三通相接的设计与施工[J]. 隧道建设, 2007 , 27(增刊) : 290 -293 . DOI: B
The Power tunnels in Yonghegong area was connected to the existing power ditches using the technique called “underground triconnections”, which need not remove the existing underground pipelines and disturb the road traffic. The design and construction of the “underground triconnection” technique are presented in this paper.
/
| 〈 |
|
〉 |