Ground Reinforcement Techniques of LargeScale Underground
Excavation under 2 150 Sewer Pipeline
Received date: 2007-03-19
Revised date: 2007-05-16
Online published: 2010-04-20
通过北京地铁十号线一期(含奥运支线)工程亮马河车站主体结构大跨暗挖段的施工,为保证结构上方2150污水管道的安全,特制定并实施多种管线加固专项处理技术,并进行跟踪监测,从而保证结构施工顺利进行,亦保证了2150污水管道的安全,为类似工程提供了可参照措施。
王贺旺 . 大跨暗挖施工下穿2 150污水管道加固施工技术[J]. 隧道建设, 2007 , 27(增刊) : 559 -562 . DOI: B
In order to construct safely the largescale underground Liangmahe Station on Metro Line 10 in Beijing, which undercrosses the 2 150 sewer pipe, some special ground reinforcement measures were taken and the necessary followup monitoring was carried out. These measures ensured the construction in good progress and the sewer pipeline in safe, which can provide some good references to the other similar constructions.
/
| 〈 |
|
〉 |