施工技术

隧道围岩大变形信息化施工

  • 黄志煌 ,
  • 戴京华 ,
  • 王立娟 ,
  • 孙伟 ,
  • 李天斌
展开
  • (1.成都理工大学地质灾害防治与地质环境保护国家重点试验室,成都 610059;2.福建龙岩永武高速公路有限公司,福建 龙岩 364000;3.西北综合勘察设计研究院, 西安 710003)
黄志煌(1978—)|男|福建仙游人|2010年毕业于长安大学隧道工程与地下工程专业|硕士研究生|从事区域地质稳定研究工作。

收稿日期: 2009-11-18

  修回日期: 2010-01-20

  网络出版日期: 2010-05-11

基金资助

四川省青年科技基金项目(09ZQ026-083)

Information aided Construction of Tunnels in Surrounding |Ground with Large Deformation Potential

  • HUANG Zhi-Huang ,
  • DAI Jing-Hua ,
  • WANG Li-Juan ,
  • SUN Wei ,
  • LI Tian-Bin
Expand
  • (1. State Key Laboratory of Geohazard Prevention &|Geoenvironment Protection of Chengdu University of Technology, [JZ]Chengdu 610059, China;2. Yong'anWuping Expressway Co., Ltd., Longyan 364000, Fujian, China;3. Northwest Research Institute of Engineering Investigations and Design, Xi'an 710003, China)

Received date: 2009-11-18

  Revised date: 2010-01-20

  Online published: 2010-05-11

摘要

建议以实施隧道监控量测的必测项目为主导,为围岩和支护的变形过程把脉,强调监控量测信息的时效性及其核心指导作用,并依据工程实例——在乌鞘岭隧道9#斜井中,围岩和支护出现大变形状态下,评判初期支护的安全性、经济性,探讨初期支护参数合理性和衬砌施作时机。建立一套简洁的监控量程实施操作系统,努力实现隧道施工过程信息化,在施工实践中协调各个关键环节,并在实际的施工效果中得到检验。

本文引用格式

黄志煌 , 戴京华 , 王立娟 , 孙伟 , 李天斌 . 隧道围岩大变形信息化施工[J]. 隧道建设, 2010 , 30(1) : 58 -62 . DOI: B

Abstract

During the construction of No. 9 inclined shaft of Wushaoling tunnel, large deformation occurs to the surrounding rock mass and the reinforcement structure. In the paper, the safety and economy of the primary reinforcement structure are evaluated and the rationality of the primary reinforcement parameters and the lining installation timing are discussed. It is proposed that enough attention should be paid to the compulsory monitoring items of tunnels so as to master the deformation process of the surrounding rock mass and reinforcement structure. The time validity and fundamental guidance significance of the monitoring data are emphasized. It is proposed that a brief monitoring implementation system should be established so as to achieve informationaided tunnel construction. During the tunnel construction, the key construction processes should be adjusted in accordance with the monitoring data and the monitoring data should be verified in the construction.