- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2009-09-09
修回日期: 2010-01-27
网络出版日期: 2010-05-11
Case Study on Settlement Control in Construction of Shallow buried |Large span Multi arch Tunnel Crossing underneath Existing Buildings
Received date: 2009-09-09
Revised date: 2010-01-27
Online published: 2010-05-11
于清浩 , 高志萍 , 谢勇涛 . 浅埋大跨连拱隧道下穿既有建筑物施工沉降控制[J]. 隧道建设, 2010 , 30(1) : 67 -70,77 . DOI: B
Wutongshan tunnel of Jichang Road project in Xiamen, China, which crosses underneath No. 34 building, is constructed by CRD method. The construction procedure of the tunnel is optimized by engineering analogy method. The settlement rule of the existing building is analyzed by numerical analysis method. Assistant construction measures, such as advance grouting, surface concrete paving, compensation grouting, fullface curtain grouting and advance reinforcement by large pipe roof, are proposed on basis of the measured settlement values and simulated settlement values. In the end, the settlement of the building caused by tunnel construction is effectively controlled, with the final settlement being less than 40mm.
/
| 〈 |
|
〉 |