Construction Technology of Earth Pressure Balance Shield Machine Crossing a River
Received date: 2009-03-26
Revised date: 2009-04-01
Online published: 2010-04-06
杨关青 , 代为 . 土压平衡盾构机过江施工技术[J]. 隧道建设, 2009 , 29(增刊1) : 26 -31 . DOI: B
The left tube and the right tube of the shield tunnel on Guangzhou Metro Line 6 (Datansha Station-Ruyifang Station) crosses Pearl River once respectively. During the construction, such measures as the application of earth pressure balance mode, boring parameters optimization, controlling of muck quantity, grouting quantity, position of shield machine and boring speed and muck improvement are adopted to ensure that the shield machine successfully crosses over the Pear River.
/
| 〈 |
|
〉 |