Key Technology of Earth Pressure Balance Shield Construction
in Water-rich Sandy Gravel Stratum
Received date: 2009-03-18
Revised date: 2009-04-01
Online published: 2010-04-06
章龙管 , 杨书江 , 郭家庆 . 富水砂卵石地层土压平衡盾构施工关键技术[J]. 隧道建设, 2009 , 29(增刊1) : 52 -56 . DOI: B
Based on the shield tunnel in Bid 4 (tunnel between Chengdu South Railway Station and Gymnasium of Sichuan) on Chengdu Metro Line 1, this thesis discusses about the adoption of a key technology of earth pressure balance shield construction aiming at the water-rich sandy gravel stratum of Chengdu Metro.
Key words: EPB shield; water-rich sandy gravel stratum; key technology
/
| 〈 |
|
〉 |