Cutter Support Maintenance and Cutter Modification Technology of
Shield Machine under Atmospheric Pressure
Received date: 2009-03-18
Revised date: 2009-03-26
Online published: 2010-04-06
吴庆红 . 盾构常压下刀座修复及刀具改造技术[J]. 隧道建设, 2009 , 29(增刊1) : 73 -77 . DOI: B
Appropriate cutters collocation and cutters inspection and replacement in long distance TBM boring is an important and difficult point of a project. With the Yellow River Crossing works of South-to-North Water Transfer Project, this thesis will discuss on the construction technology of foundation consolidation, water level dropping in deep ground, cutter head maintenance, cutter modification, etc adopted in entering earth cabin in deep ground with high water pressure.
/
| 〈 |
|
〉 |