- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2005-12-25
网络出版日期: 2010-04-16
Outline of Tunnel Construction by means of Method of Undercutting with Shallow Overburden
Received date: 2005-12-25
Online published: 2010-04-16
王梦恕 . 隧道工程浅埋暗挖法施工要点[J]. 隧道建设, 2006 , 26(5) : 1 -4 . DOI: B
The paper clarifies the concept of underground works with shallow overburden, expatiates on the basic principle and development trend of method of undercutting with shallow overburden and presents the principles of construction by means of method of undercutting with shallow overburden. Furthermore, the paper makes a description and comparison of the construction outline, applicable scope and condition, advantages and disadvantages of the different construction methods of undercutting with shallow overburden, which include full crosssection method, top heading/bench method, center diaphragm (CD) method, cross diaphragm(CRD) method, double side drifts method, as well as central drift method, columndrift method, side drift method and pilebeamarch (PBA) method suitable for tunnels withsuperlarge crosssections. Finally, the paper summarizes the outline of tunnel construction by means of method of undercutting with shallow overburden so as to achieve emphasis effect.
/
| 〈 |
|
〉 |