Case Study on Simultaneous Lining Construction Technology for
West Qinling Railway Tunnel Constructed by TBM
Received date: 2010-04-07
Revised date: 2010-04-15
Online published: 2010-05-25
苏睿 , 刘晓翔 , 高文山 . 西秦岭铁路隧道TBM掘进同步衬砌施工技术探讨[J]. 隧道建设, 2010 , 30(2) : 125 -127,161 . DOI: B
The arrangement of the conveyor belts, flexible ventilation ducts, water supply pipes and high voltage cables for West Qinling tunnel with belt conveyor mucking system, which is constructed by TBMs, is presented in the paper. The design of the fullface hydraulic lining formwork jumbo is described. The paper can be served as reference for similar projects in the future.
/
| 〈 |
|
〉 |