Comparison and Contrast among Different Construction
Methods for Doubletrack Railway Tunnels in Soft Ground
Received date: 2010-01-13
Revised date: 2010-03-13
Online published: 2010-05-25
徐勇 , 刘仲仁 , 王维高 , 寇江 . 铁路双线软岩隧道控制大变形施工工法比选[J]. 隧道建设, 2010 , 30(2) : 134 -136 . DOI: B
Serious settlement, convergence and deformation always occur during the construction of doubletrack railway tunnels located in soft ground. 3bench 7step construction method, CRD construction method and enlargedarchfoot bench method are adopted in the construction of Liangshui tunnel on LanzhouChongqing railway. These three construction methods are compared in terms of safety, advance rates and equipment availability. It is concluded that enlargedarchfoot bench method is more suitable for the construction of doubletrack railway tunnels located in soft ground.
/
| 〈 |
|
〉 |