Case Study on TBM Stepping Modes in West
Qinling Tunnel on LanzhouChongqing Railway
Received date: 2010-01-08
Revised date: 2010-02-20
Online published: 2010-05-25
陈大军 . 兰渝铁路西秦岭隧道TBM步进技术[J]. 隧道建设, 2010 , 30(2) : 162 -168,178 . DOI: B
West Qingling tunnel is constructed by TBM tunneling method assisted by drill and blast method. The stepping of TBM through the tunnel section constructed by drill and blast method is presented. The mode of stepping with arcshaped slide way and thrust cylinder and the mode of stepping with integral support frame and electrical motor drive are described in terms of technical features, key control points and operation methods. The two stepping modes are compared in terms of advantages and disadvantages. Finally, the mode of stepping with arcshaped slide way and thrust cylinder is chose.
/
| 〈 |
|
〉 |