Construction Technology for Connection Section between Inclined
Shaft and Main Tunnel in Phyllite Ground with High Ground Stress
Received date: 2010-01-05
Revised date: 2010-04-06
Online published: 2010-05-25
豆小天 , 徐双永 . 高地应力千枚岩地层斜井进正洞岔口地段施工技术[J]. 隧道建设, 2010 , 30(2) : 206 -211 . DOI: B
The relationship between the strike of the phyllite ground and the deformation of the tunnel is analyzed and the deformation control measures, including radial grouting and temporary support, are summarized in the paper, with the construction and deformation control of the connection section between the inclined shaft and the main tunnel of West Qinling tunnel on LanzhouChongqing railway in phyllite ground with high ground stress as an example. Suggestion is also made on the technical parameters and crosssection design of such works in such ground conditions. The paper can be served as reference for similar projects in the future.
Key words: high ground stress; phyllite ground; inclined shaft; main tunnel; connection section
/
| 〈 |
|
〉 |