锦屏一级水电站地下厂房预应力锚杆张拉伸长值试验分析
张传红
Analysis on Tensioning Length Test on Prestressed Rock Bolt in Construction of Underground Powerhouse of Jinping I Hydropower Station
ZHANG Chuan-Gong
隧道建设
.
2012, (4): 467
-473
.
DOI: 10.3973/j.issn.1672-741X.2012.04.007