• CSCD核心中文核心科技核心
  • RCCSE(A+)公路运输高质量期刊T1
  • Ei CompendexScopusWJCI
  • EBSCOPж(AJ)JST
二维码
锦屏一级水电站地下厂房预应力锚杆张拉伸长值试验分析
张传红
Analysis on Tensioning Length Test on Prestressed Rock Bolt in Construction  of Underground Powerhouse of Jinping I Hydropower Station
ZHANG Chuan-Gong
隧道建设 . 2012, (4): 467 -473 .  DOI: 10.3973/j.issn.1672-741X.2012.04.007